Newsletter - Beta
Technology
November 22, 2026
November 22, 2026
SpaceX targets a 4:23 a.m. PT launch on November 22 for NROL-136, which would be the 15th launch in the National Reconnaissance Office's proliferated architecture, but a news report cites 4:16 a.m. PT and the NRO page lists November 21. The booster is planned for its 14th flight and a return landing at Vandenberg, while the payload count, sensors, and orbit remain undisclosed. The piece covers the backup window, launch sequence, and what the published sources do and do not establish.
ThreatLocker reproduced FastUnlock, a technique that gives a non-administrator account code execution from a Windows lock screen when an attacker has physical access, but it does not break BitLocker encryption or recover its key. The method works on a booted machine whose drive is already unlocked, so a preboot PIN, hibernation, or full shutdown may reduce exposure, though FastUnlock-specific testing of those states was not established. No Microsoft advisory or patch had been located as of November 22, and no real-world exploitation has been documented.
The Commission detected the attack on October 22, says most affected applications are back online, and reports no evidence of a breach affecting staff as a whole, though that wording does not rule out exposure of individual records. No attacker has been named, no final data assessment exists, and the full list of systems still offline is not public. This entry covers the restoration timeline, CERT-EU's assessment that the ARTEX penetration-testing tool was highly likely involved, and staff union criticism of internal communication.
The FDA has approved once-weekly Sogroya for children aged 2.5 and older with Turner syndrome growth failure, which Novo Nordisk says is the first long-acting growth hormone for this U.S. indication. In a 105-girl, 52-week trial, annualized height velocity was 8.9 cm per year weekly versus 9.7 cm per year with daily somatropin, noninferior but not superior. Launch timing, pricing, and insurer coverage for the Turner indication have not been disclosed.
NASA ran RS-25 engine No. 10001 for its planned 200 seconds at Stennis on November 18, producing performance and reliability data for future Artemis missions. The engine will not fly, and NASA did not describe the test as certifying Artemis IV's four flight engines. Public materials also leave out pass/fail criteria, a current acceptance count for those engines, and the next test date.