Newsletter - Beta
Technology
November 10, 2026
November 10, 2026
SpaceX and Vandenberg moved USSF-627 from Monday to a four-hour Tuesday window opening at 6:49 p.m. Pacific, with a Wednesday backup, and no reason for the delay was given. The booster is on its seventh flight, with a droneship landing planned about eight minutes after liftoff. The payload's identity, purpose, and orbit remain undisclosed in official notices, so reported details beyond the schedule and booster history are unconfirmed.
Planet Labs signed a multi-launch agreement with Stoke Space on November 9, but the number of launches, financial terms, and first mission date have not been disclosed. Nova's 2027 flight demonstrations still depend on remaining engine and structural testing, an FAA license not shown as issued, and a $150 million Pentagon loan commitment that has not yet reached financial close. The summary lays out what the deal secures for Planet's launch options and which timing and regulatory questions remain open.
Urenco USA says it has produced the first commercial cylinder of LEU+ (5 to 10% U-235) in the Western world at its New Mexico plant, under an NRC authorization for enrichment up to 10%. The cylinder's exact enrichment and its first customer are undisclosed, and the shipment forecast for late spring 2027 has not yet occurred. The piece also covers how NRC's HALEU definition overlaps with LEU+, why higher-assay fuel is still needed for some advanced reactors, and where competing Western enrichment projects stand.
The NRC issued a construction permit on November 9, 2026, for four X-energy Xe-100 reactors at Dow's Seadrift site in Calhoun County, Texas. The permit authorizes construction only: an operating license is still required before fuel loading, and Dow has not made a final decision to proceed, with a preliminary investment decision expected in 2027. The review does not serve as a generic design approval, so other Xe-100 projects such as Washington's Cascade facility must complete their own licensing.
The FDA has accepted Celcuity's supplemental application to extend gedatolisib to PIK3CA-mutated advanced breast cancer, with a goal date of June 25, 2027. Acceptance starts the review but does not signal approval. In the phase 3 VIKTORIA-1 cohort, the triplet regimen reached median progression-free survival of 11.1 months versus 5.6 for alpelisib plus fulvestrant, though no overall survival result has been reported and the evidence comes from a conference abstract and sponsor updates.
The FDA granted orphan-drug designation to Vivesto AB's Cantrixil (TRX-E-002-1) for acute myeloid leukemia on November 1, 2026, but the drug remains preclinical for this use, with no AML trials registered and no IND confirmed. Designation offers tax credits and fee exemptions, and seven years of market exclusivity only if the drug is eventually approved. The piece sets out what the sponsor's animal data and a past ovarian cancer trial do and do not show, and which milestones are still pending.